Electrical Infrastructure for the Extremeña Talasol Solar Farm

The scope of the project includes engineering, procurement and construction (EPC), as well as auxiliary facilities to inject energy into the grid. It also has a 400 kV substation; a 24 km-long high voltage line for interconnection with the grid; and a 2-year operation and maintenance (O&M) services contract.

Talasol_edited

Customer:

METKA (MITILINEOS)

Budget:

Duration:

2020

Location:

Talaván, Cáceres (Spain)